Applying the Circular Twin process to a real-life 2FE Primary School built in 2017, we achieved...
*All within standard budgetary parameters
(48% reduction in lifecycle EC) (Note: this meets the RIBA 2030 Climate Challenge target < 500kgCO2/m2)
(for products and 30-year UK offset)
The important factor to consider in the Circular Twin project is that this is a research project into the process, looking in more detail at how existing processes can be changed in which to reduce Whole Life Carbon.