In Circular Twin, we enabled our engineers to get close to the supply chain in a very collaborative way. This enabled the supply chain to impart critical, real-time information on design, buildability, cost and carbon to our engineers at RIBA Stage 1 and 2 empowering us as a collective Team to make informed design decisions at an ultra-early stage in the evolution of our built asset.
Though shifting our ‘business as usual’ behaviour and having these discussions (which typically occur much later in the design and build process) we were able to pragmatically reduce carbon through our material selections and engineering calculations.