Apollo Cradles
On our C1 project, Apollo Cradles have worked closely with us through early engagement to produce a system that would severely reduce the risk of façade installers dropping items. They installed a drop down system between the wring face of the mast climber and the façade. The system had to be easy to use, electrically interlocking, modular & adjustable. This was achieved through design, testing and installation on-site.